Propuesta de un plan de mantenimiento preventivo basado en la metodología de las 5Q' S para los equipos de carga del área de empaque de la empresa Cemex - Colombia.
Share
Date
2023-11-27
Director(s)
Publisher
Universidad Antonio Nariño
Campus
Program
Degree obtained
Document type
COAR type
http://purl.org/coar/resource_type/c_7a1f
Citation
Bibliographic Managers
Document Viewer
Select a file to preview:
item.page.resume
Abstract
This maintenance proposal is based on the 5Q'S methodology, which was applied to the
loading equipment of the packaging area of the Cemex company - Caracolito, Colombia.
An initial diagnosis was carried out on the 5 forklifts and 2 skid steer loaders, where it was
determined that the main failures of these equipment are damage to the fan, oil leaks
through hoses, damage to the tires and rims and a warning of malfunctions in the forklifts.
elevators.
item.page.subject.keyword
item.page.coverage.spatial
Ibagué, Tolima (Colombia)