Alternativas de Gestión RCD de la construcción de la Vía que comunica a Hidroeléctrica Ituango
dc.contributor.advisor | Wilson, Rodríguez Calderon | spa |
dc.contributor.author | Chiquillo Estupiñan, Yineth Bibiana | spa |
dc.creator.cedula | 10481719833 | spa |
dc.date.accessioned | 2022-04-28T18:28:14Z | |
dc.date.available | 2022-04-28T18:28:14Z | |
dc.date.issued | 2021-11-17 | spa |
dc.description.abstract | A hydroelectric power plant is responsible for converting the power of water into electric energy; in order to take advantage of the power of these, large hydraulic infrastructures are built whose function is to exploit to the maximum the strength of this resource, which is renewable and emission-free (iberdrola, 2017). Knowing this, in Colombia the construction of a hydroelectric power plant called HidroItuango was proposed, which could be considered as the pride of Civil engineering in Antioquia and Colombia (Semana, 2018). | eng |
dc.description.abstract | Una Hidroeléctrica es la encargada de convertir el poder del agua en energía eléctrica; con el fin de aprovechar la potencia de estas, se construyen grandes infraestructuras hidráulicas las cuales tienen como función explotar al máximo la fuerza de este recurso, el cual es renovable y libre de emisiones (Iberdola, 2017). Conociendo esto, en Colombia se planteó la construcción de una central hidroeléctrica llamada Hidro Ituango, la cual podría ser considerada como el orgullo de la ingeniería civil en Antioquia y Colombia (SEMANA, 2018) | spa |
dc.description.degreelevel | Pregrado | spa |
dc.description.degreename | Ingeniero(a) Civil | spa |
dc.description.degreetype | Investigación | spa |
dc.description.notes | Presencial | spa |
dc.identifier.bibliographicCitation | ALCALDIA DE MEDELLIN. (2009). Dec 0440 de 2009 (Gestión de Residuos) | PDF. https://es.scribd.com/document/21523742/Dec-0440-de-2009-Gestion-de-Residuos | spa |
dc.identifier.bibliographicCitation | ALCALDIA DE MEDELLÍN. (2010). DECRETO No 0874 24 de Mayo de 2010. https://www.medellin.gov.co/irj/go/km/docs/wpccontent/Sites/Subportal%20del%20Ciudad ano/Medio%20Ambiente/Secciones/Noticias/Documentos/2010/08- Agosto/DECRETO%20N%C2%BA%200874.pdf | spa |
dc.identifier.bibliographicCitation | Alternativas de Gestión RCD de la construcción de la Vía que comunica a Hidroeléctrica Ituango | spa |
dc.identifier.bibliographicCitation | Bravo Fernando Nicolás. (2010). Reciclado y reutilizo de Residuos de Construcción y Demolición, una herramienta para el desarrollo e. http://www.ideassonline.org/public/pdf/RCDDocumentEsp.pdf | spa |
dc.identifier.bibliographicCitation | CAROLINA PÁEZ JIMÉNEZ. (2019). Guía para el manejo integral de los residuos de construcción y demolición en la ciudad de Barranquilla. | spa |
dc.identifier.bibliographicCitation | Carolina Páez, C. P. (2019). Guía para el manejo integral de los residuos de construcción y demolición en la ciudad de Barranquilla. Obtenido de https://manglar.uninorte.edu.co/bitstream/handle/10584/8725/9789587891232%20eGuia %20para%20manejo%20de%20residuos%20de%20construccion.pdf?sequence=1&isAllo wed=y | spa |
dc.identifier.bibliographicCitation | Cindy Castiblanco. (2020). Control ambiental de residuos de construcción y demolición en Bogotá | Bogota.gov.co. https://bogota.gov.co/mi-ciudad/ambiente/control-ambiental-deresiduos-de-construccion-y-demolicion-en-bogota | spa |
dc.identifier.bibliographicCitation | CONTRALORIA. (2018). GESTIÓN DE LAS AUTORIDADES AMBIENTALES EN EL PROCESO DE LICENCIAMIENTO. BOGOTÁ: CONTRALORÍA General de la Nación. Obtenido de https://www.contraloria.gov.co/documents/20181/1134239/Informe+Auditoria+ITUANGO. pdf/239ac985-f378-4eda-8cbc-e3129d87a66c?version=1.1 | spa |
dc.identifier.bibliographicCitation | DADSA. (2015). Glosario – DADSA. https://dadsa.gov.co/index.php/glosario/ | spa |
dc.identifier.bibliographicCitation | Distrital, S., & Ambiente, D. E. (2014). Guía para la elaboración del Plan de Gestión Integral de Residuos de Construcción y Demolición (RCD) en obra. | spa |
dc.identifier.instname | instname:Universidad Antonio Nariño | spa |
dc.identifier.reponame | reponame:Repositorio Institucional UAN | spa |
dc.identifier.repourl | repourl:https://repositorio.uan.edu.co/ | spa |
dc.identifier.uri | http://repositorio.uan.edu.co/handle/123456789/6350 | |
dc.language.iso | spa | spa |
dc.publisher | Universidad Antonio Nariño | spa |
dc.publisher.campus | Bogotá - Sur | spa |
dc.publisher.faculty | Facultad de Ingeniería Civil | spa |
dc.publisher.program | Ingeniería Civil | spa |
dc.rights | Acceso abierto | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | spa |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | spa |
dc.rights.license | Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0) | spa |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | spa |
dc.subject | RCD | es_ES |
dc.subject | Construcción de vías | es_ES |
dc.subject | Residuos de construcción | es_ES |
dc.subject.ddc | 624 | es_ES |
dc.subject.keyword | RCD | es_ES |
dc.subject.keyword | Track construction | es_ES |
dc.subject.keyword | Construction waste | es_ES |
dc.title | Alternativas de Gestión RCD de la construcción de la Vía que comunica a Hidroeléctrica Ituango | es_ES |
dc.type | Trabajo de grado (Pregrado y/o Especialización) | spa |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | spa |
dc.type.coarversion | http://purl.org/coar/version/c_970fb48d4fbd8a85 | |
dc.type.version | info:eu-repo/semantics/acceptedVersion | spa |
dcterms.audience | Especializada | spa |
Files
Original bundle
1 - 3 of 3
- Name:
- 2022_YinethBibianaChiquilloEstupinan.pdf
- Size:
- 528.41 KB
- Format:
- Adobe Portable Document Format
- Description:
- Trabajo de Grado
- Name:
- 2022_YinethBibianaChiquilloEstupinan_Autorización.pdf
- Size:
- 422.21 KB
- Format:
- Adobe Portable Document Format
- Description:
- Autorización de autores
- Name:
- 2022_YinethBibianaChiquilloEstupinanActa.pdf
- Size:
- 115.74 KB
- Format:
- Adobe Portable Document Format
- Description:
- Acta de grado