Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)Molina Gallego, Carlos MartinGuachetá Reyes, María Alexandra2021-11-062021-11-062021-06-25http://repositorio.uan.edu.co/handle/123456789/5180Population growth implies an increase in the demand for public services and the obsolescence of the aqueduct and sewerage networks in urban areas, make necessary to carry out projects to rehabilitate and build infrastructure works of this nature; An ideal and versatile solution is to use Trenchless technologies due to the numerous advantages that they represent, such as the reduction of environmental and social impacts, the elimination of the negative implications of traffic and the effects on commercial areas, among others, that counteract the high initial costs required for installation.El crecimiento poblacional implica a su vez un aumento en la demanda de servicios públicos y la obsolescencia de las redes de acueducto y alcantarillado en las zonas urbanas hacen necesaria la ejecución de proyectos para rehabilitar y construir obras de infraestructura de ésta índole, una solución idónea y versátil es emplear tecnologías Trenchless o sin zanja por las numerosas ventajas que representan como la disminución de impactos ambientales y sociales, la eliminación de las implicaciones negativas del tráfico y las afectaciones a las zonas comerciales, entre otros; que contrarrestan los altos costos iniciales requeridos para su instalación.spaAcceso abiertoAlcantarilladoAcueductoTuberíaTrenchlessZanjaEstado del conocimiento de los métodos para instalar y rehabilitar redes de alcantarillado y acueducto con tecnologías Trenchless en Bogotá Trabajo de grado (Pregrado y/o Especialización)SewerAqueductPipelineTrenchlessDitchinfo:eu-repo/semantics/openAccesshttp://purl.org/coar/access_right/c_abf2Acueducto. (2006). PLAN MAESTRO DE ACUEDUCTO Y ALCANTARILLADO (Documento Técnico Soporte). https://www.acueducto.com.co/wps/html/resources/empresa/DocumentotecnicoDTS.pdfAcueducto. (2019, August 26). Dos modernas tuberías recogerán el alcantarillado de la zona oriental de Bogotá. https://tinyurl.com/y2ysavwwAldana, M. J. (2017). PROYECTO DE REHABILITACIÓN DEL TRAMO 3 DE LA LÍNEA TIBITOC-CASABLANCA. https://ictis.org/images/docs/2017-09-25-no-dig-medellinmemorias/mauricio-jimenez.pdfAldana, M. J. (2017). Integral Network Management: A Case Study of Bogotá and the Empresa de Acueducto, Alcantarillado y Aseo de Bogotá, EAB ESP. Procedia Engineering, 186, 654–665. https://doi.org/10.1016/j.proeng.2017.03.282Aldana, M. J., & López, F. S. (2017). Water Distribution System of Bogotá City and Its Surrounding Area, Empresa de Acueducto y Alcantarillado de Bogotá - EAB E.S.P. Procedia Engineering, 186, 643–653. https://doi.org/10.1016/j.proeng.2017.03.281Alvisi, S., & Franchini, M. (2009). Multiobjective Optimization of Rehabilitation and Leakage Detection Scheduling in Water Distribution Systems. Journal of Water Resources Planning and Management, 135(6), 426–439. https://doi.org/10.1061/(asce)0733- 9496(2009)135:6(426)Barbosa, G. (2013). APLICACIÓN DE TECNOLOGÍAS TRENCHLESS EN BOGOTÁ. Retrieved from https://repository.ucatolica.edu.co/bitstream/10983/1592/3/ARTICULO APLICACIÓN DE TECNOLOGIAS TRENCHLESS EN BOGOTÁ.pdfBessac. (2020). CONSTRUCCIÓN DE TÚNELES Y MICROTÚNELES. http://www.bessacandina.com/images/files/brochure-Bessac-Andina.pdfCai, L., & Polak, M. A. (2019). A theoretical solution to predict pulling forces in horizontal directional drilling installations. Tunnelling and Underground Space Technology, 83, 313– 323. https://doi.org/10.1016/j.tust.2018.09.014Chapman, D., Providakis, S., & Rogers, C. (2020). BIM for the Underground – An enabler of trenchless construction. Underground Space (China), 5(4), 354–361. https://doi.org/10.1016/j.undsp.2019.08.001instname:Universidad Antonio Nariñoreponame:Repositorio Institucional UANrepourl:https://repositorio.uan.edu.co/