Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)Molina Gallego, Carlos MartinAcosta Ávila, Maciel Esther2023-02-142023-02-142022-11-30http://repositorio.uan.edu.co/handle/123456789/7535An internship was carried out in the Iflat 63 project of the Seny SAS Construction Company, in the town of Chapinero on Calle 63 # 9-40 Bogotá, several construction processes were worked on, including the structure, gray work and white work, where They handled and carried out quantities of work with their orders. On the other hand, in the development of the administration system, the billing and budget were managed, for which basic concepts were used for the applicability in the development of the activity, additionally, a manageability of the schedule was made where it shows some nonconformities and it was carried out a readjustment in the programming of the work so that its delivery times were met and optimal performance was obtained. Finally, an analysis work was carried out by the work team in which quantities and prices were verified, revealing some flaws in the initial budget and a restructuring of the same was made for delivery to the directors.Se realizó una pasantía en el proyecto Iflat 63 de la constructora Seny SAS, en la localidad de Chapinero en la calle 63 # 9-40 Bogotá, se trabajaron varios procesos de la construcción entre ellos la estructura, obra gris y obra blanca, donde se manejaron y se realizaron cantidades de obra con pedidos de los mismos. Por otra parte, en el desarrollo del sistema de administración se dio manejo a la facturación y presupuesto, para ello se utilizaron conceptos básicos para la aplicabilidad en el desarrollo de la actividad, adicionalmente se hizo una manejabilidad del cronograma donde muestra algunas inconformidades y se realizó un reajuste en la programación de la obra para que sus tiempos de entrega fueran cumplidos y se obtuviera un óptimo rendimiento. Por último, se realizó un trabajo de análisis por el equipo de obra en el que se verificaron cantidades y precios dejando en evidencia algunas fallas en el presupuesto inicial y se hizo una reestructuración del mismo para entrega a los directivos.spaAcceso a solo metadatosestructuraobra grisobra blancaT48.23 A185pPasantía proyecto Iflat 63 Seny SASTrabajo de grado (Pregrado y/o Especialización)structuregray workwhite workinfo:eu-repo/semantics/closedAccesshttp://purl.org/coar/access_right/c_14cb(18 de junio de 2013). Obtenido de Obras por expansion: https://obras.expansion.mx/construccion/2013/06/19/la-medida-exactaAlbiol, X. F. (2018). Costes directos, indirectos y gastos generales de una obra. Telemalte , 1.Arcus global. (2017). Funciones de un maestro de contruccion. Mexico.Arqhys Contenidos. (2022). Estructuras de ingenieria. Arqhys, 1. Obtenido de https://www.arqhys.com/contenidos/estructuras-ingenieria.htmlCifuentes, D. L. (2015). HISTORIA DE LA INGENIERIA CIVIL: RECONOCIMIENTO DE LOS ESCENARIOS OCUPACIONALES DE LA INGENIERIA CIVIL EN COLOMBIA, EN FUNCION DE LAS NECESIDADES DE INFRAESTRUCTURA Y DE LAS TENDENCIAS DE FORMACION. Bogotacontraloría general de medellin. (2019). CIRCULAR No.01. Medellin. Obtenido de https://www.cgm.gov.co/cgm/Paginaweb/N/Resoluciones%20Circulares%20y%20Otros %20actos%20administr11/001%20Circular%20AIU%20De%202019%20Directrices%20 De%20La%20Contralora%20201900001283.pdfContreras, A. G. (2018). LA OBRA GRIS EN LA EDIFICACION BASICA. Nuevo leon. Obtenido de http://eprints.uanl.mx/20638/1/20638.pdfGerencie.com. (2022).Guillermo, C. A. (2011). DiSEÑO DE UN PL AN DE MEJORAS . Guayaquil: repositorios. Obtenido de https://docplayer.es/164916743-Universidad-de-guayaquil-facultad-defilosofia-letras-y-ciencias-de-la-educacion-instituto-superior-de-postgrado-y-educacioncontinua.htmlMassieu, W. (2008). ACABADOS EN LA CONSTRUCCIÓN. MEXICO. Obtenido de https://www.ipn.mx/assets/files/cecyt11/docs/Guias/UATecnologicas/Construccion/5toSe mestre/acabados-en-construccion.pdfinstname:Universidad Antonio Nariñoreponame:Repositorio Institucional UANrepourl:https://repositorio.uan.edu.co/